Master Bedroom Remodel: Ready For Tile

This last November I installed tile in the Kitchen, it was supposed to be practice for the master bathroom tile install. I’m glad I did. I learned a few things: one that the dry winter air made it difficult to keep up with the drying the concrete products, two that it’s easy to lay a tile and think it’s level only to come back later and realize it is not.

My very small kitchen does not need perfect tile. As some point I will remodel it and do something else. I decided that I needed additonal practice and I would tile the master bedroom before attempting the bathroom. Before I could do anything with the master bedroom I had to remove all the crap that had accumulated since I had started using it as storage. To remove the crap from the master bedroom means making space in other rooms. I made about two trips to Goodwill. I still have quite a bit of crap but it felt good getting rid of that stuff.

The master bedroom had been unused for about 5 years with no remodeling progress and once I had the room cleared the project started to move quickly. I started by putting in a larger electrical conduit from the breaker box to the attic, I then ran the 220volt wires from the box to the thermostat location in the bedroom. I also finally wired up the electrical to the master bathroom’s radiant floor heating elements. Then I installed the insulating mat on the concrete floor and the the WarmlyYours heating elements. Getting the conduit to the breaker box was a huge step, since it also allows me to complete a number of other projects.

Before putting down the elements I thought I would try to install wallpaper. After a day or so the wallpaper was in it started separating from the wall. I still need to go back and fix it.

The electric heating elements need to be covered in some sort of cement product such as thinset or self leveling concrete. After my experience of putting in self leveling concrete in the master bathroom I knew I didn’t want to try it again. I considered using a layer of thinset but decided that the risks of having to crawl around on the elements and having to deal with the height thickness in the closet, which had no elements, was too much of a problem. I eventually had a local company Koch Mechanical install a 3/4 inch layer of gypcrete. On a square foot basis, the $400 I payed them for the installation may have been expensive, I could have easily wasted that much trying to do it myself.

The gypcrete was installed on Thursday and I was able to walk on it in only a few hours after it was installed. Good news as I didn’t have to fight to keep the cat out. It’s still very soft and will take a few weeks to fully harden. Also good news as I have other plans for the next few weeks.

This weekend I also installed a ceiling fan along with a separate wall switch and a hallway socket on the same circuit. This completes the electrical work for these two rooms and I can put up remaining pieces of drywall.

I expect to have this room complete, except for painted trim, in thirty days.

Master Bathroom Remodel: Electrical Nearly Complete

Recessed fixturesbroan exhaust fan

The two recessed lighting fixtures are installed. The fixture over the toilet is a Broan 744 Recessed fixture with exhaust Fan. It’s supposed to have a noise rating of 1.5 sones, which isn’t the quietest but not the loudest. It’s the quietest recessed fixture I could find. I’m done with all the attic work in this location so I put the ceiling back up hopefully I won’t change my mind about something and have to take it out again.

I still want to put in two electrical outlets, one for a heated towel rack and one to put in a cabinet (so I can put all my rechargeable stuff and hide it). I have to decide where I want to tie into the existing GFCI protected circuit.

I special ordered some bathroom fixtures from Lowes on Wednesday. I can’t believe how much I spent on them, but I just didn’t like the cheap in-stock stuff. Bathroom fixtures just simply are not cheap. They were supposed to call me on Thursday and let me know how long before they arrive and it’s Saturday and I haven’t heard anything back.

I’ve put together the base cabinets I bought from IKEA to figure out how to lay them out. I’ve drawn out several ideas but it’s hard to tell without actually seeing it.