OMG! I Actually Worked On The Master Bathroom

Last fall, I threatened that I would have the master bathroom completed by the end of the winter. Here it is spring and I did almost nothing to the bathroom. I have a variety of excuses that I wont go into now, however I did finally make some actual progress on it this weekend.

Before I can do anything I need to install the pocket door. Before I install the pocket door I need to relocate the wiring that exists on the wall where the door goes.

Original wiring location

The wiring consists of power in, a wire to the lights controlled by a switch and a power out to a outlet. The good news is the wiring was easy to move to the next wall, it was loose in the attic and there was plenty of room to move it. I thought I would leave the outlet unpowered for now, until I figured out how I was going to rewire everything, apparently the wire to the outlet is also hooked up to the living room.

Temporary wiring location

Now I have a problem that I need to wire that outlet back up, so i have Romex running along the other side of the bathroom along up to the switch. It looks pretty messy and dangerous in the pictures, I know. Trust me it’s safe and temporary.

I need to decide how to wire up a exhaust fan, will it go near the light switch or near the toilet? I also need to figure out if I’m going to use a fancy digital shower control. If so It will use the power from the outlet then I can wire it up properly.

Finally I can install the pocket door. I have the studs marked to cut down, but I’m waiting for some friends to come by and verify my measurements before I screw it all up. I will save the pocket door install for another post.

Taking The Master Bath Back To The Studs

About a year ago most house remodeling projects came to a halt. Costs got a little out of control and I ended up with some large credit card bills. I’ve eliminated those bills and am ready to start back on my projects. I didn’t waste any of that money, it was just a bit too much to spend at once. I now have this radical new idea that I will call “planning and budgeting” and I will apply it to projects going forward.

A quick recap on this project, the house was a foreclosure. Though not trashed, it was pretty dated and in need of remodeling in several places. The master bath showed signs of leakage in the shower. It’s pretty clear that it’s been going on for a while, it had leaked into the adjacent bathroom and into the master bedroom.

Tree roots under the shower tile

I was sure the bathroom wasn’t usable in it’s current condition and would need to be tore down to the studs. As I started to demolish the walls of the shower I found that it was pretty much being held together with tree roots. Roots had grown a good foot up the wall of the shower in between the tile. As the roots took hold of the tile, it probably just made the leaking worse.

Cement gaps around shower drain

This bathroom has not been used in at least 4 years. Yet as I broke up the mortar and shower pan I found the mortar was still pretty wet. There were so many roots that it smelled like a nursery. Finally, I think i have found the root cause. The drain pipe is basically floating, there’s a huge gap of missing concrete around it and I can clearly see where main roots have made their way through the floor (this isn’t the first time I’ve had issues with the cement in this house). I assume that a little water made it’s way around the drain, signaling for the roots to come through. As the roots grew threw the tile the wall leakage just got worse causing more roots to grow. At least I know I wasn’t wrong that there was no saving it.

The demolition is about 99% complete. I intended to get a good amount of this bathroom completed this winter. I’ve got a basic plan put together, but that’s a post for another day.