An Extreme Makeover house in Pinon Arizona didn’t turn out too well. The house is too big and it takes too much energy to heat despite having technology like solar panels. The house has some surprising quality issues like only having two-thirds of the insulation it should have. The owner of the house has moved in with in-laws.

Extreme Makeover Home’s has some problems with lawsuits and foreclosures. Although they appear to be building houses for the needy they are ultimately producing the show for ratings. That’s not an entirely bad thing but it influences how the houses are constructed.

Since McMansions are out of style and house sizes are shrinking, I wonder if Extreme Makeover House edition will make homes smaller too.

Master Bathroom Remodel: Plumbing Finished

It’s been almost two months since my last post on the master bathroom remodel progress. I had to wait for a special order shower head to arrive which took over a month. I also had to pay for the previous months remodel.

Shower connections

The special order bathroom fixtures I bought were very expensive. I can’t believe I spent so much on them. Non stock fixtures are simply not cheap and i really didn’t like the stock fixtures. I think i will be really happy with them once they are installed but I didn’t expect to pay that much for them.

Today a plumber friend came over and help me install the new shower and vanity plumbing. OK, really he did all the work. I have never done any copper soldering before so I wasn’t able to do this myself. Now that I see how it’s done it’s really not that hard and i think i could do it myself next time.

IMG_0453

The first thing which needed to be done was to replace the dual control shower controls with a single control and route the shower head from the west wall to the south wall. There wont be a regular shower head installed here, it will be a handheld shower with a slide bar. Therefore I thought it would be best to install it on a separate wall from the shower controls.

I decided to move the vanity from the north wall to the east wall. I think i can better utilize this small space and install an extra cabinet next to the sink by having the cabinet on the east wall. The connections points however were too far over to be hidden under the sink. The cold water outlet and the drain pipe both needed to be moved over several inches.

I can now start putting the walls back up. Before I do I will put some insulation in to act as sound dampening materials. I also ordered the electric radiant floor heating for both the master bath and bedroom. Warmly Yours is having a 15% off sale for order of $1500 or more which i took advantage of. It may take me a few more months to pay that off and start work on the bathroom again.