Partial Fireplace Deconstruction

My house was built in the late 1970’s or early 1980’s. I don’t know because it was a foreclosure and the bank didn’t really give a shit, they just wanted to sell it. It is easy to tell the era due to the rest of the houses in the neighborhood and the style of the house.

The fireplace is one of those dated artifacts that is not to my liking. It consists of a false brick veneer with a brick hearth that sticks out from the wall about a foot.

IMG_0580

If the original designer of the house had put in some storage under the hearth or made it somewhat more useful, it might have been worth keeping. Otherwise the hearth just takes up too much space and I wanted to take it out before I re-did the floors in the living room.

IMG_0582

I surrounded the area around the fireplace with sheet plastic that I attached to the ceiling with tape and push pins. I smashed the hearth brickwork with a sledge hammer and a pry bar. Under the brick veneer I found dirt and brick fill, no hidden treasure of gold and rubies.

IMG_0583

There is still a layer of brick attached to the block fireplace that I was not able to remove. Like many of the projects at my house this is a mult-stage project. When I get ready to hire someone to do the drywall throughout the house, I will remove the remainder of the bricks and have drywall installed where the brick is now.

I was somewhat worried about completing this project as it was not undoable, but I am happy with the extra space I have in the living room and the fireplace is still functional.

Also see the Toolmonger post.

Taking The Master Bath Back To The Studs

About a year ago most house remodeling projects came to a halt. Costs got a little out of control and I ended up with some large credit card bills. I’ve eliminated those bills and am ready to start back on my projects. I didn’t waste any of that money, it was just a bit too much to spend at once. I now have this radical new idea that I will call “planning and budgeting” and I will apply it to projects going forward.

A quick recap on this project, the house was a foreclosure. Though not trashed, it was pretty dated and in need of remodeling in several places. The master bath showed signs of leakage in the shower. It’s pretty clear that it’s been going on for a while, it had leaked into the adjacent bathroom and into the master bedroom.

Tree roots under the shower tile

I was sure the bathroom wasn’t usable in it’s current condition and would need to be tore down to the studs. As I started to demolish the walls of the shower I found that it was pretty much being held together with tree roots. Roots had grown a good foot up the wall of the shower in between the tile. As the roots took hold of the tile, it probably just made the leaking worse.

Cement gaps around shower drain

This bathroom has not been used in at least 4 years. Yet as I broke up the mortar and shower pan I found the mortar was still pretty wet. There were so many roots that it smelled like a nursery. Finally, I think i have found the root cause. The drain pipe is basically floating, there’s a huge gap of missing concrete around it and I can clearly see where main roots have made their way through the floor (this isn’t the first time I’ve had issues with the cement in this house). I assume that a little water made it’s way around the drain, signaling for the roots to come through. As the roots grew threw the tile the wall leakage just got worse causing more roots to grow. At least I know I wasn’t wrong that there was no saving it.

The demolition is about 99% complete. I intended to get a good amount of this bathroom completed this winter. I’ve got a basic plan put together, but that’s a post for another day.